PHASE ONE
To arrange for a site survey and the production
of existing site plan drawings.
To present the concept through discussion and
illustration, describing colours, textures and
finishes with material samples and images of any
items to be specified if appropriate.
To produce the proposed drawings; entailing schematic
layouts to approval, culminating in the agreement
of the final complete proposed layout.
To submit the proposed drawings for initial building
control / planning permission applications as
appropriate.
BRIEF SHOULD NOT BE MODIFIED AFTER THIS POINT.
ANY FURTHER CHANGE IN LOCATION, SIZE, SHAPE, SCOPE
OR COST AFTER THIS TIME WILL INCUR AN ADDITIONAL
CHARGE FOR ABORTIVE WORK.
PHASE TWO
To prepare drawings for construction of project
as appropriate.
To prepare mechanical and electrical drawings.
To prepare drawings for construction of all on
site carpentry items and all items to be produced
off site.
To prepare a full specification document detailing
all construction works, including plumbing and
electrical systems.
To include details of all items to be supplied,
including cost of supply.
To obtain the cost of construction works including
a works schedule from the contractor.
To reach final approval of costs for specified
items and for construction works.
To submit a final cost document for supply and
labour, and a schedule to meet client approval.
PHASE THREE
To liase with the contractor for the duration
of the construction period to monitor site progress,
culminating in a satisfactory completion of works.